Parish News

Construction and Post-Construction Erosion and Sediment Control Ordinance

12/28/2007

Effective January 1, 2008: Construction and Post-Construction Erosion and Sediment Control Ordinance Regulating Discharges to the Municipal Separate Stormwater Drainage System (MS4) to Prevent and/or Minimize Pollution from Stormwater Runoff. The Bossier Parish Police Jury has adopted a construction and post-construction ordinance regulating discharges to the municipal separate stormwater drainage system (MS4), to prevent and/or minimize pollution from stormwater runoff, to be effective January 1, 2008. These regulations apply to "Urbanized Areas" only, which are defined as areas of the parish with the population density which requires coverage of the Stormwater Management Program. To find out if you are located within an "Urbanized Area", please click here to find your location.

all news »